Rebuilding Place in the Urban Space

"A community’s physical form, rather than its land uses, is its most intrinsic and enduring characteristic." [Katz, EPA] This blog focuses on place and placemaking and all that makes it work--historic preservation, urban design, transportation, asset-based community development, arts & cultural development, commercial district revitalization, tourism & destination development, and quality of life advocacy--along with doses of civic engagement and good governance watchdogging.

Sunday, June 13, 2021

Development mitigation measures/proffers proposed by Massachusetts General Hospital in Boston

 -- "MGH pushes ahead with nearly $2 billion expansion," Boston Globe

One interesting point made in the article is that the Massachusetts General Hospital campus has 27,000 employees, 78% who get to and from the campus by sustainable modes--walking, biking, and transit.  The Hospital is served by the very busy Charles Street/MGH Station on the Blue Line.

Bicycle parking.  While the project will add car parking spaces for a total of 971, moving them from the surface to underground, it will have more total spaces for bike parking, 1,043 than cars, with the addition of more than 500 spaces.  It also proposes bike lane improvements on Charles Street and elsewhere on the campus.

Public realm improvements.  It proposes a variety of improvements, including two outdoor plazas and a street arcade, wider sidewalks, benches, among others.

Photo credit.

Connecting the Blue and Red Line subways.  Perhaps the biggest mobility contribution is underground tunnel easement and other elements within the complex, to accommodate the extension of the Blue Line from the Charles Street/Massachusetts General Hospital Station, under Charles Street to the Bowdoin Red Line Station, thereby connecting the two lines.

This should spur the MBTA to move the project forward ("Red Line-Blue Line connection could be much cheaper than thought, study says").  They hadn't really prioritized it until three years ago, even though previous administrations had agreed to it as part of environmental and other mitigation measures although they have a target date of 2040.  From the article:

Supporters of the connector say it would make it easier to travel from Logan Airport, East Boston, and Revere — all on the Blue Line — to Red Line stops such as Massachusetts General Hospital and Kendall and Harvard squares in Cambridge. Switching between the two lines now requires a short ride on the Green or Orange lines.

The new estimate includes building a 1,500-foot rail tunnel under Cambridge Street from the Bowdoin stop on the Blue Line and new platforms at Charles/MGH station, where the lines would connect. It also includes the cost of moving utilities. 

It doesn’t include aspects of the project that could increase costs to about $500 million, such as designs, testing, any necessary modifications to vehicles, and finishing touches on the station, like adding elevators.

Since the new hospital construction project will be completed in 2030, MBTA should fast track this connection project so that it can open simultaneously with the newly constructed hospital buildings.

Community center space.  The project also calls for the demolition of a community center, and the proposal calls for providing space for a new community center in the development, along with a food bank.  

Affordable housing.  And a different building on the campus would be shifted to the provision of affordable housing.

=========

It's rare for nonprofit projects, even by large institutions like colleges and hospitals, to include mitigation measures in response to new building projects, which often come at the expense of existing operations.

To me one of the biggest is the cessation of the Seattle waterfront heritage streetcar service.  The Seattle Art Museum extended its campus, creating a sculpture park, and in the process eradicating the yard and maintenance buildings for the streetcar, without having to replace them.  

This is rare.

This rowhouse at 837 22nd St. NW, in the Foggy Bottom neighborhood, was built in 1886. It's the last rowhouse on the block and it does not qualify for historical preservation protection. (Frank Leone)

Separately, George Washington University intends to demolish a historic, undesignated building on its campus, as part of a development project ("A District couple hope that GWU won’t tear down an old Foggy Bottom rowhouse," Washington Post).

DC's oversight of the GWU campus plan never imposed serious mitigation measures, especially around historic preservation.

GWU's expansion in Foggy Bottom has pretty much eliminated the residential and mixed use neighborhood that had previously existed, comparable to the impact of schools like New York University on its neighborhood.

Memorable transit proffers.  Boston has some examples of developer contributions to transit station creation such as Federal Realty Investment Trust's Assembly Row and New Balance's new headquarters ("New Balance Bought Its Own Commuter Rail Station," Atlantic Magazine) providing funding for the addition of transit and other mobility improvements.

A casino, the Pittsburgh Stadium Authority and other interests paid towards the extension of the T subway to the North Shore, serving a casino and stadiums for the Pittsburgh Pirates and Steelers.

In Portland, Portland State University paid for station creation and other improvements for the streetcar, including providing access to the streetcar route within the campus, while Oregon Health Sciences University operates the aerial tram.

In New York City, SL Green constructed underground connections between subway stations, its building, and Grand Central Station ("Behind the rise of the 77-story One Vanderbilt," New York Post).

The New York Islanders are paying almost the entire cost for an LIRR station to serve their new arena ("Islanders arena project at Belmont Park now includes new LIRR station," Newsday).  The Golden State Warriors, Phoenix Suns, and forthcoming Seattle Kraken hockey team pay/will pay local transit systems for transit access for ticket holders.

In DC, the city, federal government, and a TIF district taxing property owners each paid 1/3 towards the construction of the infill New York Avenue Red Line Station.

In Seattle, Paul Allen's Vulcan Investments, developer of the SoDo district, paid towards ("Paul Allen's major makeover offers high risks, huge payoffs," Seattle Times) the creation of the Seattle streetcar, to help facilitate his real estate developments (which was a particularly common method by developers during the streetcar development era).  

Subsequently, Amazon paid for additional streetcars and payment for operations to expand service.

Historically, the Van Sweringen brothers of Cleveland are perhaps the most remarkable.  They wanted to build a streetcar service to serve their developments in Shaker Heights and Cleveland Heights but couldn't get right of way.  So they bought the Nickel Plate Railroad to get access to the railroad's existing right of way to include the rapid transit service.

Labels: ,

Friday, July 25, 2014

Rail transit launches: Northern Virginia's Silver Line; Tucson's streetcar

Tucson's Streetcar started service this morning, with free service through the weekend, and a multitiude of special events and promotions. See "Streetcar celebrates its official launch" from the Arizona Daily Star.

I like this editorial cartoon from the Daily Star by David Fitzgerald, which comments on the critics, the fact that the streetcar system is now operational, and that $600 million of new development in Downtown Tucson has been sparked by the new streetcar.

It's the kind of result that will happen, likely in DC, once a streetcar becomes operational on H Street NE.

2. The extension of the Washington area's Metrorail system further into Fairfax County opens tomorrow.  The Express free daily has a special section of articles today and last Sunday's Washington Post included a similar section.

I will write more extensively about these events next week. But these previous blog entries are meat for people interested in the topic.

-- "Short term vs. long term thinking: transit, the Washington Examiner, Fairfax/Loudoun Counties vs. DC," (2011)

-- "A clear signal of a failure in "metropolitan" transportation planning: a proposal to eliminate a subway station from Dulles Airport," (2012)

-- "Without the right planning "controls" you can't stop change: Loudoun County and rail service in Northern Virginia, (2012)

-- "The state of Arlington County Virginia's commercial real estate market: 2012 and the future," (2012) -- this piece discusses how the extension of Metrorail hurts the ability of Arlington County to retain federal agencies, as their rents will be undercut by newly accessible to Metrorail properties in Fairfax County

-- "Silver Line delays: maybe the real lesson is that contracting out construction to the private sector doesn't always work so well," (2014)

-- "The Silver Line WMATA story that WJLA-TV missed," (2014)

Labels: , , , ,

Wednesday, November 11, 2009

St. Louis regional transit planning process as a model for what needs to be done in the DC Metropolitan region

The St. Louis transit planning process underway currently looks to be quite interesting. See the website Moving Transit Forward, as well as "MetroLink Expansion Would Take Many Years, Metro Official Says" from the St. Louis Post Dispatch and the Moving Transit Forward Powerpoint presentation.

There is one public meeting still to come, next week, in this first phase of the public process. There are two more sets of public meetings scheduled, for the release of the draft plan and the response, and then for the release of the final plan.

In the section of the website called "What's My Role?," they have posted (in pdfs) the presentation boards from 5 of the 6 stations. (The sixth station is where people vote for their choices.)

- Station #1 – Moving Transit Forward Overview
- Station #2 – Existing Conditions
- Station #3 – Potential System and Service Enhancements
- Station #4 – Funding Transit
- Station #5 – You Be the Transit Planner (concepts for system expansion)
- Station #6 – What Do You Prefer?

Here are a few particularly interesting ones.

St. Louis regional transit planning process, slide
This one is particularly good, because it shows how they are breaking out the system improvement (and expansion) plan into three distinct phases:

“Moving Transit Forward” will consist of three elements:

– 5-year plan – service restoration and enhancement,
– 10-year plan – major capital projects, and
– 30-year plan – overall vision for long-term system development.

This slide discusses the purpose of transit and where it works best.
What transit does slide, St. Louis Transit Planning process

This slide is interesting because in the DC region, the fastest growing transit service is paratransit, and it's breaking the WMATA budget bank. Here it is discussed as a co-equal service. In our region, it's rarely discussed so systematically out in the public sphere.
Paratransit slide, St. Louis Transit Planning process

Two boards on funding explain how the local transit system is funded. (They could have had another board on how highways are funded just so that people could start to understand that all mobility is "subsidized.")

This board, from the "You Be The Transit Planner" exercise links cost of service with ideas for service. (It is what is called a constrained planned, focused on what can be reasonably funded.)
Transit planning exercise, St. Louis

The DC region needs to embark on a wide ranging metropolitan transit (re)planning public process to restore trust in and a common understanding of the WMATA transit system

After the accident in June, which killed 9 people and injured many others, and the continuing problems with safety, financial problems, lack of a regularized funding system, lack of appropriate regulatory oversight, not to mention problems with how the organization is led from the top (both the Board of Directors and top management), it seems reasonable to have a similar kind of regional transit planning exercise here.

Not only would this restore trust in the WMATA system in the DC region, by building a sense that WMATA is accountable to riders, it would also rebuild a regional understanding of what the system is capable of and how it should expand.

It has been 40+ years since the WMATA Metrorail system was first conceived and 33 years since parts of the system began opening. It's time for an assessment/reassessment.

This ought to be preferred over the grab bag of extension proposals in Virginia and Maryland (with little consideration of the impact on the current system) that the system faces currently.

WMATA only sees the world in terms of subway and bus. So the planning process needs to be broader and deeper, focused on transit generally, not just on WMATA operations as they are set up now.

At the same time, such a process should consider truly regional transit planning (which means including railroad service as an option), and the scope of the study should be broad, rather than overly-circumscribed and limited.

WMATA, in conjunction with the Transportation Planning Board of the MWCOG and the local jurisdictions, as well as MARC and VRE and other appropriate state authorities in Maryland and Virginia as well as DC, should launch a planning process similar to that of St. Louis, to come up with a metropolitan transportation plan that allows for transit services to be delivered where they need to be, but one that uses the most appropriate means (heavy rail, light rail, street car, passenger railroad, different types of bus service) to do so.

It should look at funding issues as well as heavy rail expansion where appropriate. That means not just extending transit service outward, but intensifying transit service at the core as well.

Such a planning process should also consider questions of leadership, management, and oversight. As well as funding.

It's the only way to build a truly regional understanding and commitment to transit for the Washington metropolitan region. Without such a planning process, I think we're destined for a lot more of the same incremental and discoordinated transportation planning that we have today.

At the same time, the District of Columbia needs to understand the centrality of transit to the city's economic and competitive advantages, and plan accordingly.

Another example

The Chicago region has a campaign called Moving Beyond Congestion, which could be the model for the St. Louis process.

It's the regional transportation plan normally created by the metropolitan planning organization (tasked by the federal government to coordinate transportation planning in particular metropolitan areas), but in a truly public process, focused on setting the stage for grappling with real needs and hard questions, rather than a more administrative process working between agencies, rather than reaching out to the public.

I tend to believe that these more external planning processes come about when the "s*** has hit the fan" over funding, and the agencies have no choice but to reach out to the public and work to change the political, economic, social, and management frameworks which the transit agencies are currently operating under.

In short, they need a lot more money. And the current setup isn't providing it.

I do think we are at that point in the DC region.

From the Moving Beyond Congestion Strategic Plan:

Our Five Year Investment Lays the Foundation for the Future

Numbers like these are overwhelming until you see what is behind them, so here’s what the five year plan means for you. We divide our capital investments into three categories:

§ Maintain – meaning repairs and upgrades that keep our existing systems in good working order so that there are fewer delays and other problems.
§ Enhance – meaning more and better and faster service without building any major new city or suburban train lines.
§ Expand – meaning new train and bus routes requiring major investments that will cost billions of dollars and take years to complete.

Note that to maintain the transit system in Chicago over five years, $7.3 billion is required. To enhance the system they need $1.1 billion, and to expand, they need at least $2 billion.

But Chicago has a pretty extensive fixed rail transit system already, comprised of extensive El (heavy rail) and railroad passenger service. The DC region lacks as extensive a system, even though compared to many metropolitan regions across the county, our region has a wide ranging heavy rail transit network.

What to do? Planning the next generation of transit in the Washington metropolitan region

The various proposals to extend the Metrorail system in Virginia and Maryland would cost many billions of dollars. And proposals to build the separated blue line in DC, from Arlington, would cost a "few" billion dollars as well.
WMATA polycentric rail system -- Belmont
Polycentric transit service in the DC region, from Belmont, Cities in Full.

At the same time, further deconcentrating the region ("sprawl" versus land use intensification) makes transit less efficient, and proposals to extend the WMATA rail system outward are being made, often in my opinion, without best considering the trip behavior/origin and destination information for subareas (counties) within the region. There are at least six priorities as I see it.

1. Provide more capacity for Metrorail at the core.

Regardless of proposals to extend Metrorail outward, the reality is that the core is freezing up. Regardless of original projections for Metrorail usage that exceed today's projections, the reality is that the system will reach capacity in less than two decades, and even now, station throughput and train capacity needs improvement.
Proposed changes for the WMATA system, 2001 (separated blue line)
This Washington Post graphic from 2001 shows the proposed separated blue line. This proposal was dropped in 2003 due to financial problems. In a conversation with Matt Johnson (Track Twenty-Nine) he passed on a conversation with WMATA planners talking about "updating" the core capacity study, looking really at "rebuilding" the transit system for new realities and greater use, in thinking about a separated blue line as part of a new transit system being built upon the old. (My words, not his.)

2. Extend Metrorail?

Where Steve Belmont in Cities in Full does criticize the WMATA system as polycentric, designed to support sprawl, it could be that in some situations, it makes sense to extend the heavy rail system further, such as to Fort Belvoir in Fairfax County, or even out to Fort Meade in Maryland (recently discussed in "Imagine the Green Line to Fort Meade" in Greater Greater Washington).

But at the same time, this means making the original Purple Line, which as conceived is a circumferential route (the original concept was heavy rail but now it is being planned as a light rail system) connecting all the legs,should be deemed a regional priority, rather than a project pursued by the separate jurisdictions somewhat independently.
Purple Line Map  DC Metro
Sierra Club image. The current Purple Line light rail plan in Montgomery and Prince George's Counties, from Bethesda to New Carrollton, is but a "segment" of the total line as it was originally conceived.

3. Change regional land use development policies now, especially those of the federal government.

Sprawl is happening regardless of WMATA, and to reduce automobile use, land use and transportation planning has to be intertwined. It can't be separate. Obviously, land use generates transportation demand.

Someone wrote a letter to the editor in the Gazette, "Metro funding essential to county growth policy," that Montgomery County shouldn't change its growth policy to a transit-complementary policy from the automobile-connected policy it has without being connected to transit planning and funding. They are absolute right.

But it must be emphasized that allowing major land use development, ranging from the military base relocation process which is moving many installations from transit-rich locations to transit-abysmal locations without having taken that into account in the planning process to the location of National Harbor in Prince George's County without ensuring substantive transit connections stresses the road system to levels that can't be corrected.

At the same time, some of these locations have the potential for significantly improved transit service, but not if you don't plan for it at all.

(The model for how to do this comes from the Netherlands. See "Utrecht: 'ABC' Planning as a planning instrument in urban transport policy.")

4. Isn't it time that counties develop complementary surface rail transit programs of their own?

At the end of the day, the WMATA system is focused on DC (and certain other job centers like Bethesda, Crystal City, Rosslyn, etc.). Getting to and from DC from commuters is the backbone of the system, as well as providing intra-jurisdictional service in densely populated communities, especially within DC and to some extent in Arlington County.

Extending the WMATA system outward lengthens trips, requires more equipment and personnel, but at the cost of trip time and money. It's not clear that such extensions adequately leverage what the system does best.

I think that rather than considering extending Metrorail out to Potomac Mills ("Prince William Democrats Push Proposal to Extend Metro to Traffic-Snarled Area: Lawmakers Push Transit Extension" from the Post) it might make more sense for counties like Fairfax to develop streetcar and light rail plans of their own, complementing WMATA's heavy rail system and railroad stations, but focused on providing transit that actually will be heavily used, and to begin the repatterning of land use and transportation policy and practices in a more focused manner.

This is what is happening with the creation of the Purple Line light rail system in Montgomery and Prince George's Counties. But it needs to be extended as a model for other counties in approaching their own transportation needs, but in a manner which leverages and complements the Metrorail system.

See the past blog entry, "Reprint (with editing): The Meta-Regional Transit Network," which discusses the concept of the metropolitan transit network and the various center city and suburban subnetworks within it.

These articles, "Fort Meade proposes Metro extension: Master plan includes adding to rail line to accommodate new jobs" from the Baltimore Sun (2009) and "Plan for Metro to BWI Gaining Momentum" (2006) from the Post, and towards Charles County "Prince George's Sees Andrews As Hub of Development" (2007) from the Post discuss other proposals to extend the Metrorail system.

Note that Arlington's Transit Element in their Transportation Plan is a model for county-specific plans, as is their pursuit, with Fairfax County, of the creation of a streetcar route on Columbia Pike.

5. Expand and extend passenger railroad services.

The farther a location is from the core of the region, the more likely passenger railroad service makes sense. Plus, a passenger railroad system shouldn't be focused on only serving commuters, but the region, and ideally, it should be one seamless service, rather than a collection of services (Maryland and Virginia have separate services) at present.

See the past blog entry "A regional railroad passenger transportation vision for DC, MD, VA, WV and parts of PA (and Delaware)" for more on this topic.
Proposed map of a Washington-Baltimore regional rail system
Early ideas for a Washington-Baltimore-Northern Virginia regional passenger rail system from Beyond DC.

I can't remember which blog suggested having additional railroad stations within DC and Northern Virginia beyond Union Station as a way to improve overall throughput on both the railroad and for those subsequently transferring to the subway, but that is something that needs to be put on the table as well. Models are the three railroad stations in Philadelphia (Market Street, Suburban Station, and 30th Street) which because they were serving either the Pennsylvania Railroad or the Reading Railroad they weren't originally connected--now they are, or railroad service in London and Paris. (Although DC doesn't have the kind of density of population or employment possessed by either London or Paris.)

6. Continued improvements in bus transportation and customer service.

In the blog entry "The revised revised People's Transportation Plan/2008 Transit-Transportation wish list I wrote about this extensively and don't feel it needs to be updated much. There were 8 major recommendations, although some are more specific to DC:

• Improve the bus service. I say do this before thinking about streetcars. We need to make bus service exciting and sexy, in order to boost transit use. I recommend better marketing and wayfinding systems, better bus shelters (coming) and waiting stations, and probably sexier buses, which to my way of thinking, would be double deckers, on routes that could accommodate them. Double deckers are 40 feet long, and more maneuverable than 60 foot articulated buses.

• Create intra-neighborhood transit (bus) services so that people can get to and from local services, commercial districts, schools, libraries, and to and from transit stations without having to drive. (This is a DC specific recommendation)

• making intra-neighborhood transit service free (Tempe's Orbit bus service is an example of how to do it). (This is a DC specific recommendation)

• Dumping what I call political bus service--bus service that ought to be reconfigured because it is not cost effective but isn't because of political posturing. But it wastes money and deserves other segments of the transit market. (This is a semi-DC specific recommendation)

• Improve all "transit waiting environments" (not just for bus service, but on the subway too).

• Significantly improve transit marketing.

• Create a system of regional "Mobility" stores to market walking, bicycling, and transit to residents and commuters, but as a lifestyle, not merely as mode shift for commuters. (Based on what Arlington is already doing.)

• Improve wayfinding and transit information.

Conclusion

In short, it's a pretty big charge for a regional transit plan, but it needs to be done. And the longer one avoids such a process, the harder it is to do, and the more necessary.

Labels: , , , , , ,

Friday, April 11, 2008

Development at the Armed Forces Retirement Home

King Building, U.S. Soldiers Home, DC (Armed Forces Retirement Home0
From Reyn Anderson, Washington Central Parks:

Have you wanted to get involved in Washington Central Parks quest to get parts of the Armed Forces Retirement Home (AFRH) re-opened as public park and wondered how? Now’s your chance! Please come out THIS MONDAY, April 14, 6:30 -8 to a public meeting sponsored by the National Capital Planning Commission (at Bruce-Monroe Elementary School , 3102 Georgia Avenue ). You can download the AFRH’s development plans or view a hardcopy at the Petworth Library.

The AFRH’s plans still include:

- over 6 million square feet of development – that’s the size of the Pentagon, or ten times the DC USA development in Columbia Heights

- almost 9,000 parking spaces – that’s almost double the number of cars going out to a Nationals’ game at the new stadium, coming to our neighborhoods EVERY DAY

Come support the alternative: development along the public transportation corridors of North Capitol and Irving Streets, supported by Emancipation Park at the Old Soldiers’ Home! Emancipation Park will:

- preserve the setting of Lincoln ’s Cottage, where he worked on the Emancipation Proclamation, for generations to come

- provide a green backbone to support the neighborhoods East of Georgia Avenue, which currently have access to five times less parks and open space than neighborhoods West of Rock Creek Park!
-------------------
Note that I have suggested throughout the Small Area Planning process for Brookland, that transportation linkage be required between developments along the North Capitol Street Corridor, in particular the future development of the McMillan Reservoir, the Washington Hospital Center--the number one destination in the city without rail-based transit access, and the development on the AFRH property.

While Michael S. suggested a Brown Line heavy rail line to serve this area, streetcar service makes a lot of sense, as a form of "development oriented transit" (rather than "transit oriented development") as was pioneered with the Portland Streetcar's service of the newly created Pearl District, and Paul development of the South Lake Union district in Seattle, which also introduced streetcar service, to speed along "progress."
Conceptual map for transit expansion in the DC region
Conceptual map for transit expansion in the DC region, produced for Rebuilding Place in the Urban Space by the good graces of David Alpert and Greater Greater Washington. This includes the conceptual design of a brown line, as well as the revival of the old separated blue line proposal, which in this map, is colored silver, and includes the routing of the proposed Dulles Line.

BeyondDC's Transit vision suggests that this area could be serviced by streetcar as well.
Crowds at the Seattle Streetcar launch
Crowds at the Seattle Streetcar Launch. Seattle Post-Intelligencer photo.

Labels: , , ,